// UTILITIES

Connect every stage of utility field operations.

Manage inspections, maintenance, repairs, contractors, field evidence, corrective actions and approvals through one connected operational platform. Validly gives operations teams visibility over work in progress, gives field teams clear digital job information, and creates a traceable record from initial work request through to verified closure.

Utilities hero
Plan and dispatch work

Create structured work with asset details, instructions, documents, forms, required checks and evidence requirements.

Support field delivery

Give engineers and contractors the information they need to inspect, maintain, repair and document assets in the field.

Verify and close work

Review completed work, identify defects, assign corrective actions and maintain a complete record of evidence and approvals.

OPERATIONAL PROBLEMS & BUSINESS IMPACT

Utility operations become difficult to control when field work, contractors, evidence and approvals are disconnected.

Utility organisations coordinate planned maintenance, inspections, faults, repairs and asset interventions across large field teams and contractor networks. When work orders, field records, photographs, safety checks and approvals are spread across different systems, spreadsheets, paper forms and messaging channels, operational visibility quickly breaks down.

Fragmented work orders and asset information

Engineers may receive job details, asset information, drawings, instructions and supporting documents through several different systems or communication channels.

BUSINESS IMPACT
Time is lost finding information, field teams may work from incomplete instructions and additional administration is required to reconcile records after the job.

Limited visibility of field progress

Operations teams often know that work has been assigned but cannot easily see whether an engineer has arrived, started the activity, found an issue or completed the work.

BUSINESS IMPACT
Delays and blocked work are identified late, supervisors spend time chasing updates and reactive decisions become harder to coordinate.

Safety and required checks managed separately

Pre-start checks, risk assessments, permits, site conditions and required evidence can sit outside the actual work process.

BUSINESS IMPACT
Required steps may be missed, work can be delayed waiting for documentation and demonstrating that correct procedures were followed becomes more difficult.

Inspection findings disconnected from corrective work

Asset inspections frequently identify defects, deterioration or follow-up maintenance requirements, but those findings may then be transferred manually into another system or spreadsheet.

BUSINESS IMPACT
Corrective actions can be delayed, duplicated or lost between teams, allowing maintenance backlogs and operational risks to remain open for longer.

Inconsistent contractor evidence and completion records

Different contractors may submit photographs, forms, measurements and completion information in different formats and through different channels.

BUSINESS IMPACT
Review teams spend more time validating work, accountability becomes unclear and completed jobs can remain open while missing evidence is chased.

Slow job close-out and audit preparation

Evidence, approvals, corrective actions and supporting documents are often assembled after field work has already finished.

BUSINESS IMPACT
Job close-out takes longer, operational records remain incomplete and additional administrative effort is needed for customer, quality and compliance reviews.
HOW VALIDLY CONNECTS THE OPERATION

From work request to verified closure.

Validly creates one connected operational process across planners, operations teams, field engineers, contractors and reviewers.

Raise / PlanPrepareAssignField WorkCapture EvidenceReviewCorrectApproveClose
01

Prepare the work

Create repeatable work types for inspections, maintenance visits, repairs, service activities and other field operations. Each job can contain:

  • Asset and location information
  • Scope of work
  • Instructions
  • Technical documents
  • Required forms
  • Safety and quality checks
  • Evidence requirements
  • Due dates and priorities
02

Assign and dispatch

Assign work to internal engineers, maintenance teams, contractors and specialist service providers, giving each person clear responsibility for what needs to be completed and when.

03

Complete work in the field

Field teams receive the job information they need to carry out the activity. They can:

  • View instructions and documents
  • Complete inspections and checklists
  • Record measurements
  • Capture photographs
  • Add notes
  • Record asset conditions
  • Obtain signatures
  • Submit completion information
04

Capture evidence as work happens

Forms, photographs, measurements and supporting evidence remain connected to the relevant job rather than being submitted separately. This creates a structured record of what happened in the field.

05

Review completed work

Supervisors, operations teams or quality reviewers can examine submitted work before closure. They can:

  • Check completed forms
  • Review photographs
  • Verify required evidence
  • Add comments
  • Approve the work
  • Return incomplete submissions
06

Turn defects into actions

When an inspection or review identifies a problem, corrective work can be created and assigned. The action remains connected to the original inspection, asset, evidence and review history.

07

Close with a complete record

Once the required work and reviews are complete, the job contains a traceable history of:

  • Work completed
  • Forms submitted
  • Evidence captured
  • Issues identified
  • Corrective actions
  • Reviews
  • Approvals
  • Completion status
HOW VALIDLY SOLVES IT

Three connected Validly products give utility operations one operational system linking work assignment, field execution, evidence, corrective actions and verification.

HOW IT'S USED

Operations teams create workflows for inspections, maintenance activities, faults, repairs and other field interventions. Work is assigned to the appropriate team and tracked through Assigned → In Progress → Completed → Review → Corrective Action → Approved → Closed. Supervisors can see work status, review completed activities, return incomplete work and assign follow-up actions without relying on separate spreadsheets or email chains.

CHOOSE IT WHEN

You need to coordinate planned and reactive field work across operational teams, engineers and contractors.

OPERATIONAL BENEFIT

Creates clear ownership and real-time visibility across utility work while standardising how activities move from initial assignment through to verified closure.

Explore Valid Workflows
CHOOSE THE RIGHT VALIDLY PRODUCT
Valid Workflows
CHOOSE IT WHEN

You need to coordinate planned and reactive field work across operational teams, engineers and contractors.

OPERATIONAL BENEFIT

Creates clear ownership and real-time visibility across utility work while standardising how activities move from initial assignment through to verified closure.

Valid Forms
CHOOSE IT WHEN

Your main challenge is paper forms, inconsistent inspections or incomplete field records.

OPERATIONAL BENEFIT

Improves the completeness and consistency of field records and reduces the need to manually re-enter information after the job.

Valid Compliance
CHOOSE IT WHEN

Safety, quality, operational or compliance requirements need to be evidenced as part of the field activity.

OPERATIONAL BENEFIT

Creates clearer traceability between the work performed, the evidence captured and the decisions made before an activity is closed.

EXAMPLE USE CASES
Planned asset inspection

Recurring inspections are scheduled and assigned to engineers. Asset condition, measurements, photographs and inspection results are captured on site and submitted for review.

POTENTIAL OUTCOME
More consistent inspection records and better visibility of completed, overdue and failed inspections.
Reactive fault and repair

A fault or operational issue creates a job that is dispatched to the appropriate engineer. The engineer records diagnosis, work completed, components used, photographs and final condition before submitting the repair for closure.

POTENTIAL OUTCOME
A clearer operational history from reported fault through to completed repair.
Preventive maintenance programme

Routine maintenance activities are scheduled across multiple assets, sites or regions and assigned to internal teams or contractors. Completion requirements are standardised across every job.

POTENTIAL OUTCOME
Better visibility of maintenance progress and fewer incomplete maintenance records.
Contractor-delivered field programme

External contractors complete inspections, maintenance or installation activities using the same structured workflow and evidence requirements as internal teams.

POTENTIAL OUTCOME
Greater consistency and accountability across contractor delivery.
Defect and corrective action management

An inspection identifies a damaged, unsafe or deteriorating asset. A corrective action is raised directly from the finding, assigned to the appropriate team and tracked through to evidence-backed closure.

POTENTIAL OUTCOME
Fewer inspection findings becoming disconnected from the work required to resolve them.
Site work and reinstatement

Field teams complete utility work and record site condition, completion photographs, checks and reinstatement evidence before submitting the activity for review.

POTENTIAL OUTCOME
A clearer completion record and faster identification of work requiring further attention.
OPERATIONAL OUTCOMES
Faster close-out
EVIDENCE CAPTURED AS WORK HAPPENS

Forms, photographs and completion information arrive with the job rather than being assembled afterwards.

Less manual re-entry
FIELD DATA LINKS DIRECTLY TO THE WORK

Information captured on site remains connected to the activity that generated it.

Clearer accountability
EVERY ACTIVITY HAS OWNERSHIP AND HISTORY

See who was assigned, what was submitted, what was returned and who approved the work.

Audit-ready records
WORK, EVIDENCE AND APPROVALS STAY CONNECTED

Maintain a traceable operational record without rebuilding the history from separate systems.

COMMON QUESTIONS
Validly can support structured field activities including inspections, planned maintenance, repairs, service visits, asset checks, corrective work and contractor-delivered activities.

See Validly across your utility field operations.

Bring one of your inspection, maintenance, repair or contractor workflows to a Validly demonstration and see how it can be managed from assignment through to verified closure. A 30-minute walkthrough using your own work types and forms.