// CONSTRUCTION

Digital approvals that close jobs the same day.

A traceable digital record of every site, from inspection to approval to handover.

[ Construction site photo ]
THE CHALLENGE

Records scattered across subcontractors

Information is split among clients, contractors and subcontractors, each keeping their own version.

Photos lost from their context

Photographs aren’t consistently linked back to the location or activity they belong to.

Snags recorded but not closed

Defects get logged but tracking them through to verified closure is inconsistent.

Completion records assembled too late

Handover packs get pulled together at the last minute, once the client is already asking.

WHO IT'S FOR

Built for the people closing out every site, every day:

[ Site Manager photo ]
Site Manager

Runs daily site diaries, toolbox talks and pre-start checks, then signs off completed work the same day.

HOW IT WORKS HERE
[ illustration ]
01 · INSPECT

Daily diaries, toolbox talks and pre-start checks are completed directly from site.

[ illustration ]
02 · RESOLVE

Snags and defects are tracked from raised to verified closure, not just logged.

[ illustration ]
03 · HANDOVER

Handover forms and supervisor sign-off build automatically into the completion record.

HOW VALIDLY HELPS
HOW EACH CHALLENGE GETS SOLVED
1One traceable digital record per project, shared across every contractor on site.
2Every photo attaches to its project, site, building, floor or work package automatically.
3Snags and defects stay open and visible until closure is verified, not just recorded.
4Handover forms and sign-off build up automatically as the work happens.
COMMON QUESTIONS
Most site teams are fully onboarded within a day, with no formal training required.

See Validly mapped to your Construction operations.

Walk through your delivery stages, job types, evidence rules and approval routes with our team.